DG Low Side Installation

Case Study · NEAC-DG-01

DG Low Side Installation

NEAC offers strong technical / mechanical expertise in DG low side installation according to industry requirement.

The Requirement

DG sets at telecom and industrial sites needed compliant exhaust routing, insulation, fuel lines and termination to AMF / LT panels for reliable changeover.

The Outcome

DG sets commissioned with compliant exhaust routing and reliable changeover.

Scope of work delivered

01Exhaust Piping & Insulation
02Silencer & Chimney
03Fuel Line & Day Tank
04AMF / LT Panel Termination
05DG Renting & Overhauling
06Load Testing

Site photos

Related Work

More case studies

All Case Studies
LT panel roomElectrical & HTTelecom & data centre sites, North India

LT & HT Panel Design and Installation

Designing and installing HT & LT panel rooms for telecom and data centre sites.

Read More
Transformer yard with GO switchElectrical & HTRajasthan · Uttar Pradesh · Delhi NCR

Transformer / PSS / RMU / GO Switch — HT Installations

Delivering transformer, PSS, RMU and GO switch installations with CEIG clearance.

Read More
Fiber runner junction and supportsData CentreData centre build-outs, North India

Fiber Runner & Cold Aisle Containment (CAC)

Structured fiber runner routing and cold aisle containment for data centres.

Read More